Configuration
Collapse menu
Fixed sidebar
Top navbar
Top navbar v.2
*Primary layout
Boxed layout
Fixed footer
Skins

Comparison of Project Charging Hours Entries vs Timekeeping Hours Computation

A Comparison of Project Charging Hours Entries vs. Timekeeping Hours Computation is a report or analysis that compares the hours recorded for a project in terms of project charging (the hours billed or allocated to the project) against the timekeeping hours (the total hours tracked or logged by employees through a timekeeping system). The goal of this comparison is to ensure accuracy in labor cost allocation, prevent discrepancies, and verify that hours charged to the project align with actual time worked.

Key Elements:

  1. Project Charging Hours Entries: These are the hours that are allocated or billed to a specific project, often based on tasks or phases. These hours may be assigned based on estimations, billing rates, or specific project milestones.
  2. Timekeeping Hours: This refers to the actual hours worked by employees, as recorded through a timekeeping system (e.g., clock-in/clock-out, timesheets, etc.). These hours represent the real time spent by each employee on the project, including overtime, regular hours, and any adjustments made.
  3. Comparison Analysis: A detailed comparison of the two sets of hours:
    • Variance Analysis: Identifies discrepancies or variances between project charging hours and actual timekeeping hours.
    • Overage/Shortage: Identifies instances where more or fewer hours have been charged to the project than were actually worked.
    • Errors or Discrepancies: Pinpoints any errors in either project charging or timekeeping, which might include incorrect logging or misallocated hours.
  4. Time Allocation Breakdown: This may involve breaking down the comparison by task, department, or employee to see where discrepancies are occurring. It could also involve categorizing the hours by project phase (e.g., planning, execution, testing).
  5. Impact on Project Budget: The report may highlight how discrepancies between the charged and actual hours can affect the overall project budget, cost estimations, and profitability.
  6. Adjustment Recommendations: Based on the findings, the report might include suggestions for correcting time entries, improving time-tracking processes, or adjusting project charges to reflect actual time worked more accurately.

Purpose

  • Accuracy in Billing: Ensures that the hours billed to the client or allocated to the project accurately reflect the actual hours worked by employees.
  • Cost Control: Helps identify and rectify issues where labor costs are either overestimated or underestimated, ensuring more accurate project budgeting and financial control.
  • Resource Management: Helps project managers assess how labor resources are being utilized on a project, ensuring that time is being allocated efficiently and correctly.
  • Transparency and Accountability: Provides a clear, verifiable comparison between the billed/projected labor hours and actual time worked, supporting transparent communication with stakeholders.
  • Audit and Compliance: Assists in ensuring that labor hours are documented properly for audit purposes and compliance with company policies or contractual agreements.

Conclusion:

The Comparison of Project Charging Hours Entries vs. Timekeeping Hours Computation is an essential tool for ensuring the integrity and accuracy of labor cost management in a project. It helps reconcile differences between projected and actual hours worked, ensuring that the project’s billing and time-tracking are in alignment, which is crucial for maintaining budget accuracy, preventing overbilling, and supporting efficient resource allocation.

ULTRA LOTTO 6/58

  • Draw Date: 01/12/2025
  • Result: 19-54-48-55-41-35
  • Price: Php 49,500,000.00
  • Winner: 0

GRAND LOTTO 6/55

  • Draw Date: 01/11/2025
  • Result: 18-25-22-06-28-44
  • Price: Php 29,700,000.00
  • Winner: 0

SUPER LOTTO 6/49

  • Draw Date: 01/12/2025
  • Result: 36-09-03-48-25-12
  • Price: Php 15,840,000.00
  • Winner: 0

MEGA LOTTO 6/45

  • Draw Date: 01/10/2025
  • Result: 12-33-32-17-08-11
  • Price: Php 16,186,700.00
  • Winner: 1

LOTTO 6/42

  • Draw Date: 01/11/2025
  • Result: 09-38-23-12-32-29
  • Price: Php 19,489,253.80
  • Winner: 1

6 Digit

  • Draw Date: 01/11/2025
  • Result: 4-7-9-3-9-5
  • Price: Php 542,624.92
  • Winner: 0

4 Digit

  • Draw Date: 01/10/2025
  • Result: 8-8-5-5
  • Price: Php 42,092.00
  • Winner: 21

SWERTRES RESULTS

  • Draw Date: 01/13/2025
  • 2PM: 7-7-6
  • 5PM:
  • 9PM:

EZ2 RESULTS

  • Draw Date: 01/13/2025
  • 2PM: 13-19
  • 5PM:
  • 9PM:

PRC RESULTS

February 2024 Mechanical Engineers Licensure Examination

February 2024 Master Plumbers Licensure Examination

January 2024 Architects Licensure Examination

November 2023 Dentists Licensure Examination

December 2023 Chemists Licensure Examination

December 2023 X-Ray Technologists Licensure Examination

December 2023 Radiologic Technologists Licensure Examination

December 2023 Occupational Therapists Licensure Examination

December 2023 Physical Therapists Licensure Examination

2023 Bar Exam Results